Services

Erection, Testing and Maintenance Facilities: We are equipped with all tools & tackles, testing equipments & maintenance facilities like…..

Maintenance Activities

1. A team of qualified operators and engineers to take care of daily monitoring of equipment condition, preventive and breakdown maintenance.
2. A complete set of procedures for recording of parameters, preventive maintenance schedules for individual equipment in sub station.
3. A set of GUIDELINES for the various types of faults in the substation their probable causes and remedies along with the list of spares necessary for the effective and trouble free operation of the substation.

Important Tools for Erection Activities

01. Derricks – 10 mts, 12 mtr, 16 mtr height suitable for 2.5 tonnes 03 Each
02. Tripods – 6 mtr height & Bipod 02 Each
03. Jack & Spindle – 5 ton & 10 ton Capacity 02 Each
04. Hydraulic Jack – 25 ton Capacity 02 Each
05. Chain Pulley blocks – 3 ton& 5 ton Capacity 01 Each
06. Normal Pulleys, Pulleys with clearing – 1 way, 2 way, 3 way 05 Set Each
07. Winch, Tirfor – 5 ton Capacity 01 Each
08. Torque wrench of 5000 Lbs Capacity 01 No.
09. Turn table – 5 ton Capacity 01 No
10. Ladders, Wooden Slippers, Garfil Ropes, Sealing & Wire rope bundles etc. 3 Bdls
11. Come along clamps for stringing of transmission lines 05 Nos
12. Spanner Sets, Gasket Punching Set 4+2 Sets
13. Template support jacks screw type 50 Nos.
14. Dewatering pumps – Electrical & Diesel 02 Each
15. Transformer Coil lifting device with slings 01 Set
16. Shuttering Plates 08 Sets

 

Important Tools for Fabrication Work

01. Gas cutting set 02 Nos.
02. Gas Welding set 02 Nos.
03. Welding Machines – Single Phase & Three Phase 02 Nos.
04. Drill Machines – Hammer Drill, Hand Drill, Pillar Drill etc. 03 Each
05. Spray gun with compressor for Painting Activities 01 Set
06. Jig Saw and Angle Grinder 01 Each
07. Cutting/Sharing Machine 01 Each
08. Power Press 50 Tons 02 Each
09. Threading Machine 01 Each
10. Oil Furnace 01 Each

 

Important Tools For Cable Laying, Stringing Of Lines & Terminations

01. Cable laying roller and Conductor Paving Rollers 20 Each
02. Turn buckles 08 Nos.
03. Conductor and earth wire Crimping Machines 02 Nos.
04. Crimping tools – Manual type upto 6 sqmm, 110
400 sqmm
4+2+1 Nos.
05. Tractor and Trolley- Mahindra B-275 01 No.
06. Mahindra Bolero Pick up Van 02 No.

 

Important Tools For Cable Laying, Stringing Of Lines & Terminations

01. Meggar – 1000 V, 1000 Megaohms: 2000 V, 2500
Megaohms : 5000 V, 10000 Megaohms
02 Each
02. Each Tester – 0 to 1 Ohms & 0 to 10 Ohms 02 Each
03. Multimeters – Analog & Digital Type, Phase sequence Meters 04 Nos
04. Tong Testers 02 Nos
05. Micro – ohm meters 01 No
06. Time interval meter 0 – 100 secs 11 Nos
07. Primary Current Injection Kit – 0 to 400 Amps 01 No
08. Secondary Current Injection Kit – 0 to 20 Amps 01 No
09. Rheostats – 8Am 15A 01 Each
10. Dimmer stats – Single Phase and Three Phase upto 28 A Capacity 01 Each
11. Transformer oil testing kits 01 No
12. Transformer oil Filtration Plant – Cap. 250 GPH 01 No

 

General Equipments

01. Pipe Bending Machines 02 Nos
02. Wireman Tool Kit 04 Nos

 

List of Tools and Equipments with the Company

Sr. No. Description of Item Quantity
01. Concrete Mixers

A. Electrically Operated
B. Diesel Operated


2 No
2 No
02. Concrete Vibrators

A. Electrically Operated
B. Diesel Operated


2 No
1 No
03. Road Roller – 8 MT Capacity 1 No
04. Steel Shuttering Plates 2000 No.
05. Plyood Shuttering For 3000 Sq. Ft.
06. Steel spans (Acrow) 2.0 - 4.0 mts. 250 Nos
07. Steel props (Acrow) 2.0 – 3.75 mts. 500 Nos
08. Earth rammer for internal compaction 1 No
09. Steel Scaffolding for plaster etc. For 10000 Sq. Ft.
10. Drilling Machines 5 Nos
11. Dewatering Pump 2 Nos
12. Mahindra- 575 Tractor with Drilling & Lifting Machine 1 Nos